Week 27
Mon 07 Jul - Sun 13 Jul 2014 (Day 137 -141)Besides my house stinking of tobacco & cigarette butts everywhere (thanks to the tradies) we managed to see the plumbing fitting all in and a start of the light fittings (light batten and LED downlights). Also tested the Tap, I have COLD water
Work for the week:-
- Ground Floor Tile Grouting (Tuesday)
- Laundry Wall Tiled (Wednesday)
- Plumbing Fittings (Friday)
- Electrical Light Fitting (Friday)
Here are some photos :-
Kitchen Sink Taps
Butler Pantry Sink Taps
Master Ensuite Basin Taps
Ensuite 2 Basin Taps and Shower fitting
** Also feature wall tiles installed ****
** Also feature wall tiles installed ****
Feature Tile
Coffee Stone Light (15x100x8mm)
Main Bathroom Basin taps and shower fittings
** Also feature wall tiles installed ****
** Also feature wall tiles installed ****
Light Batten and Smoke Alarm
LED downlights to Meal Wall Recess
So maybe by this time next week I can even turn on the light switches, what you reckon?